Results
Eleven times the engineering changed the well.
Each of these is a core taken out of a real engagement: a saving, a safety fix or a better design. Every engagement is confidential, so no operator, field or person is named. The figures are the company’s own and are given in their own context.
- What this is
- Eleven highlights from recent work, in the company’s own words and figures
- Who it is for
- Anyone deciding whether we can help with a similar problem
- What you will see
- The problem, what we did and what changed, case by case

01Design and cost
Four cases where the cost came down.
Better designs and smoother drilling cut well costs, without changing what the well delivers. Here the savings were stated in the company’s own figures.
- $4.5M saved, once managed pressure drilling was shown to be unnecessary
- 7% of well cost, then 12% more, on identical deepwater wells
- About $800,000 a well, from dropping a wiper trip
- Multi-well pads, planned from a known safe step-out

02Safety and integrity
Four cases where the well was made safer.
Safe wells are found by looking where nobody was looking. Casing wear, near collisions, a liner that would not rotate, a model of centralisers that the cement log then proved.
- Casing wear, from the shape of the trajectory
- Wells 10 m apart, that came close to collision
- A production liner that could not be rotated
- 70% of the planned centralisers, confirmed on the cement log

03Reviews and deals
Three cases where we checked it before it went ahead.
A fresh read of plans and designs before money moves, and a course taught to the next generation of engineers.
- Technical due diligence, on a field with around 100 or more planned wells
- A two-well campaign, redesigned from scratch
- A university course on real-time drilling optimisation

04Confidential
No names, by design.
All of our work, past and present, is strictly confidential. These eleven are shown only to give a flavour of what we do and of how we fight in the customer’s corner.
- No operator, field or person named
- Every figure as the company published it
All eleven
Every core, in full.
The same eleven, with what we found and what changed. Each one is a core pulled from its own hole.
- 01 · Design and cost
More wells from fewer pads
Multi-well pads
An onshore operator in an environmentally sensitive area, with little land, wanted to drill as many wells as it could from fewer pads. We built extended reach designs that gave the greatest safe step-out inside the existing technical limits and the operator’s own guidelines and KPIs. The operator could then plan multi-well pads, knowing how far each well could safely reach.
- 02 · Design and cost
Managed pressure drilling, shown to be unnecessary
$4.5M saved
A global operator wanted lower well costs. We reviewed data from wells already drilled and recalibrated the drilling window from downhole pressure data. It showed that managed pressure drilling, used until then, was no longer needed. A later independent wellbore stability study agreed, and found a narrow but workable window. The operator saved $4.5M in well costs.
- 03 · Design and cost
Deepwater wells that kept getting dearer
7%, then 12%
Identical deepwater wells were costing more each time, with no reported problem. Our analysis set out the real costs and the grey areas. We found potential savings of 7% of well cost with no design change, and a further 12% if minor design changes were allowed, with the completions left alone so production was not touched.
- 04 · Design and cost
A wiper trip that did not help
About $800,000 a well
A global operator always made a dedicated wiper trip at a shallow casing point, because of tight spots in the near-vertical section. We doubted it and plotted running-in against pulling-out hookloads for earlier wells. The trip did not help, and in most wells made the tight spots worse. The tight spots were few, and came from a handful of localised high dogleg severities. The operator dropped the practice and saved about $800,000 on every well drilled afterwards.
- 05 · Safety and integrity
Wells with no apparent problem
Casing wear
A client had been drilling shallow horizontal wells with a kick-off point that landed the horizontals well, and saw no operational trouble. Our well engineering review found serious casing wear, caused by the shape of the trajectory, on light production casing: a possible HSE issue. We designed new trajectories for the next wells and moved the production casing to heavier grades.
- 06 · Safety and integrity
Close calls between neighbouring wells
10 m apart at surface
At a global operator, wells only 10 m apart at surface had come close to collision several times, and the customer had signed anti-collision dispensation forms. That is not normal. From the historic real-time directional data we found the directional driller had often not used the right tool face: he used the closest approach to rejoin the plan, where a simple 180 degree slide away from the offset well, rejoining later, was needed. The operator corrected it and the wells are safer.
- 07 · Safety and integrity
A liner that could not be rotated while cementing
Liner would not rotate
An operator could no longer rotate its production liner while cementing, which matters on critical cement jobs. Calibrated well engineering models showed very high tortuosity from a newer specialist directional tool, with more random doglegs than expected. That left high-energy contact points along the string and used up the torque limit. The operator chose the right type of directional tool for the next wells.
- 08 · Safety and integrity
An over-design, proved on the cement log
70% of the centralisers
An operator wanted to cut its costly specialist centralisers. Detailed analysis showed only 70% were needed, though the drilling team planned to use them all. At the rig a shipment problem left only 65%. We re-ran the model for that number, and the rig followed it. The cement evaluation log after the job matched the prediction, which confirmed that 70% was enough.
- 09 · Reviews and deals
A merger, reviewed before it closed
100+ planned wells
We were engaged for the technical due diligence on a high-profile merger and acquisition covering a large offshore field with around 100 or more planned wells. After reviewing the basis of design, the field development plan and the drilling plans, we handed over a number of technical red flags and ways to correct them. The clients went back to the drawing board and looked at the deal again in their light.
- 10 · Reviews and deals
A two-well campaign, redesigned
Two wells, from scratch
A request to optimise the design for a two-well campaign showed significant problems with drillability and technical integrity, from earlier analysis that had not been adequate. We went back to the drawing board and redesigned both wells from scratch. The customer greatly appreciated the much improved design.
- 11 · Teaching
Teaching real-time drilling optimisation
Leoben, Fall 2020
We were chosen to teach an MSc petroleum engineering course on real-time drilling optimisation at the University of Leoben in Austria, in the fall semester of 2020. Mr.Naim taught the analysis techniques and roadmaps that major operators use to keep their hands on the pulse of their wells and correct emerging problems early. After very good feedback he will keep teaching specialist courses as a visiting lecturer.
Start
Send us your hardest well. We will tell you what we would find.
A design, a campaign or a bill that does not look right. We read what you have and say where we would look first. Every engagement is strictly confidential.