WellOptima AIWellCost Optima
Well costs in minutes, not days.
WellCost Optima costs a well before it is drilled: time against depth and cost by phase, and a P10, P50 and P90 range. It locks the approved AFE and tracks every later change against it while the well is drilled. It can read the plan from a photo.
- It gives you
- The plan, the range and the AFE
- When
- Before the well, then through drilling
- You start from
- A photo of the casing table, or a saved file
01Deterministic
Time against depth, and cost by phase.
Start with one plan. The well is laid out phase by phase: how long each takes, how deep it gets and what it adds to the cost. Every block you see arrive is a phase, and together they make the staircase a costing engineer knows as the time-depth curve.
- Time against depth for the whole well
- Cost by phase, section by section
- Change any number and the plan follows
02Monte Carlo
One plan is not the whole story.
The same well, as a range. Cost and days each get a P10, a P50 and a P90, built from offset wells. The posts mark where the end of the well could fall.
- P10, P50 and P90 for cost and for days
- Drawn over the plan, so the spread is visible
03AFE and cost control
Lock the AFE. Then track against it.
When the plan is approved, lock it. The AFE does not move. Every later change is booked in a variance ledger against it, as rate, time or scope, so you can see whose change it was and what it did.
- A locked baseline
- A ledger of every change since
- The AFE exported as a PDF
04Completions
The completion goes on the well.
The strings are drawn on the well, outer to inner, with the casing and hole sizes set to depth. The completion sits at the bottom of the same drawing, onshore or offshore.
- A well schematic, drawn to depth
- Casing and hole sizes listed beside it
05Templates
Say where the rig works, then start.
Templates give you a well to start from: onshore, jack-up or deepwater, by completion. The same stair re-forms for each one, with its own time and its own depth for every phase. Take one, then adjust whatever you want.
- Onshore, jack-up and deepwater
- Or one of your own
06Offset wells
A library of the wells already drilled.
Offset wells are what has already been drilled nearby. They set the range, and they can be drawn on the time against depth chart next to your plan, so you see where the plan sits among them.
- A library you can reuse
- Brought in from a workbook
- Drawn beside the plan
07Reports and exports
Then take it out, in the form people ask for.
A full report as a PDF or a Word file, the AFE, spreadsheets and charts. The well you built is not locked in the app.
- Full report, PDF or Word
- The AFE, set out by cost code
- Spreadsheets and charts
On screen
The seven parts, as the app lists them.
Each line is one screen of WellCost Optima, in the app’s own order and its own words. The example well is made up, and every cost figure in the pictures is blurred.
01
Deterministic
Time and depth, and cost by phase
One plan for the whole well. The chart runs day by day to total depth, with the casing shoes marked, and the phases are listed beside it with the time and cost of each.

02
Monte Carlo
P10, P50 and P90: the probabilistic estimate
The same well as a range. Cost and days each get a P10, a P50 and a P90, drawn on the time against depth chart over the plan.

03
AFE and cost control
Lock an AFE, track the variance
Lock the plan as the approved AFE. From then on every change goes into a variance ledger against it, booked as rate, time or scope. The AFE exports as a PDF.

04
Completions
Onshore and offshore completions
The completion on the well, with its schematic: casing and hole sizes drawn to depth, and listed beside the drawing.

05
Templates
Onshore, jack-up, deepwater and your own
Start a well from a ready template, filtered by where the rig works. Each card shows its days, phases and sections before you use it.

06
Offset wells
The library of wells already drilled
Offset wells hold what has been drilled nearby. They set the range, and they can be drawn on the time against depth chart beside the plan.
07
Reports and exports
AFE, full report, Word, spreadsheets
The work leaves the app in the form people ask for: a full report, a Word report, the AFE, spreadsheets and charts.
Data in and out
From a photo to a report.
Three ways in, three ways out. Whatever the app reads from a photo or a file waits for you to check it before it is used.
In
- Photograph itTake a photo of a casing table or a well schematic. The sizes, depths and units are read for you, and nothing is used until you have checked them.
- Choose a saved fileA saved photo, a PDF or a workbook: casing programmes, surveys, formation tops and offset wells.
- Reopen your own workA well details workbook, an offset wells workbook, or a file you saved from the app earlier.
Out
- One file of the whole wellKeep it, pass it on, or open it again later.
- ReportsThe full report as a PDF or a Word file, and the AFE set out by cost code.
- Spreadsheets and chartsThe tables as spreadsheets in one bundle, and any chart as a picture.


Next step
Let us show you how it works for your company.
Book a demo and we will go through WellCost Optima with you, from the photo of the casing table to the locked AFE.
