Services

Nine services, one well.

Every service is a stretch of the same well, from the design and the plan, through the drilling, to the day the well is retired. Dive down it, or go straight to the part you need.

Who it is for
Operators, developers and investors who have wells to design, drill or retire
How we work
One service, or several together, with the same engineers
Not here
Courses have their own page, and so does WellOptima AI
The well at interval 01: Well engineering and drilling design

01Interval

Well engineering and drilling design

The basis of design, casing and tubulars, the drilling programme and the AFE.

  • Use it when: you have a well to design, or a design you want checked.
  • Inside: Fifteen deliverables, from the basis of design to the AFE
The well at interval 02: Directional well planning

02Interval

Directional well planning

Trajectories, anti-collision, pad and slot planning, relief wells.

  • Use it when: wells are close together, long, or have to land in a small target.
  • Inside: Nineteen pieces of work, in three groups
The well at interval 03: Drilling project management

03Interval

Drilling project management

Campaign planning, tenders, operations and the end of well report.

  • Use it when: a campaign needs running, from field plan to close-out.
  • Inside: Thirteen parts of a project, from field plan to close-out
The well at interval 04: Real-time drilling optimisation

04Interval

Real-time drilling optimisation

Engineers reading the rig data with you while the well is drilled.

  • Use it when: the rig is drilling now, or will be soon.
  • Inside: Five ways to run a real-time centre, and the Dynamic Performance Gap
The well at interval 05: Integrated well data analysis

05Interval

Integrated well data analysis

What happened downhole and why, rebuilt from the data.

  • Use it when: something went wrong, a tool failed, or a bill does not look right.
  • Inside: Eight kinds of analysis, sorted by the question you have
The well at interval 06: Well plugging and abandonment

06Interval

Well plugging and abandonment

Designed, executed and recorded, barrier by barrier.

  • Use it when: wells have reached the end of their life.
  • Inside: Assess, Select, Define and Execute, with every barrier verified
The well at interval 07: Geothermal well engineering

07Interval

Geothermal well engineering

Well designs for geothermal temperatures, flow rates and rock.

  • Use it when: the well is for heat, not hydrocarbons.
  • Inside: Rock, heat, flow and fluid, and a case study of two rebuilt wells
The well at interval 08: Carbon capture and storage

08Interval

Carbon capture and storage

Well engineering for storing carbon dioxide underground.

  • Use it when: the well has to put carbon dioxide away and keep it there.
  • Inside: How carbon dioxide is stored, and why the well is what matters
The well at interval 09: Technical due diligence on wells

09Interval

Technical due diligence on wells

An independent view of wells and drilling risk before a deal.

  • Use it when: you are buying, selling or financing an asset with wells in it.
  • Inside: Eight review areas, with red flags and opportunities written down

Start

Not sure which interval you are in? Ask us.

Tell us about the well, or about the problem. We will say which service fits, and who would work on it. Courses and results have their own pages.