Plan optimisation
Nine pieces of work on the trajectory itself
- A trajectory that fits the jobShaped to the well’s objectives, so the well that results is the cost-effective one.
- The right surface locationDrilling from the place that makes the wells shortest, cheapest and easiest to drill.
- Wells in the prized rockIterative, shared planning sessions until the plan meets or beats your production targets.
- Wellbore stability in the planThe stability model sits inside the plan, so problems are met on paper, not on the rig.
- Drillability checksCalibrated, detailed checks against the known technical limits and your own drilling experience.
- Contingencies built inRoom for a sidetrack, and for a build-up rate that comes in short.
- Actual against plannedWhen a directional tool or service disappoints: is it the operating parameters, or the plan that has to move?
- Field-wide bulk planningEvery planned surface location and target assignment optimised together, in the planning software.
- Directional tools and servicesChosen to match what this well needs, which is where large savings sit.





